![]() ![]() As CAMPO projects to the year 2045, traffic numbers jump across the board with big increases on Texas 29 and major roads in and around Marble Falls. Traffic counts were added to the plan at the request of Burnet County Judge James Oakley. Funding will most likely come from federal sources, according to officials.īurnet County Precinct 4 Commissioner Joe Don Dockery pointed out that while the lakes are the area’s greatest assets, they are also a major impediment to connectivity. Map courtesy of CAMPOĪccording to the 2045 Regional Transportation Plan, CAMPO estimates the Wirtz Dam project will cost about $52.1 million. Burnet County commissioners accepted a 2020 transportation plan that helps them, along with state and regional organizations, implement and determine current and future highway needs. ![]() In August 2020, the Burnet County Commissioners Court approved a contract to begin the engineering phase of the project, which includes surveying, design, and environmental studies. The plan does include a proposed Wirtz Dam Road bridge located west of Marble Falls. The proposed bridge and connections will require more detailed analysis and funding, said CAMPO Community Outreach Manager Doise Mieres and isn’t yet included in CAMPO’s 2045 Regional Transportation Plan. The Narrows project could reduce emergency response times to the area, according to the report, but it might be more cost efficient to add emergency response infrastructure. The report focuses on the county’s main arterial network, including U.S. CAMPO Executive Director Ashby Jones presented the document to the Burnet County Commissioners Court. The Capital Area Metropolitan Planning Organization developed the non-binding plan while working alongside county and other local officials. The updated plan includes a possible bridge east of Marble Falls connecting Texas 71 and RR 1431, a project dubbed “The Narrows,” as well as the proposed Wirtz Dam bridge west of the city. Population growth is a driving force behind Burnet County traffic projects, including two new bridges, in the 2020 transportation plan accepted by the Burnet County commissioners during their Jan. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |